Cincinnati & Surrounding AreasMon–Sun: 8am–8pm
BulldogDeck

Tiered · Stepped · Built into the slope · Downtown, Cincinnati, OH · 45202

Multi-Level Decks in Downtown, OH

Multi-level decks in Downtown Cincinnati, where a raised terrace level is set back so the building guard keeps its full height. A multi-level deck is what you build when the ground will not cooperate. Stepping it down a slope in two or three platforms keeps each level closer to grade and shortens the stair run dramatically. It can take an entire guard out of the job, because a deck under 30 inches to the ground does not need one. You also get separate zones instead of one large floor with everything on it.

A terraced deck stepping down a slope with short flights between the levels
4.9/5 StarsAcross 600+ reviews
1,400+Decks built and rebuilt since 2001
PermittedPulled and inspected everywhere we build
W-2 CrewsEmployees, never subcontracted out

Multi-level decks in Downtown

Downtown (ZIP 45202) outdoor space is a terrace or a large balcony on a building. Plenty of owners want more than one flat floor on it, such as a raised platform for a lounge or a dining spot above the rest. That can be built, and the edge of the terrace decides where it goes.

On a terrace, a second level does the job walls do indoors. It divides one open, hard floor into two places with different moods, a step up for the table and the rest for chairs and planters. It also brings warm boards up over the building surface, which makes the terrace feel like a room and not a roof.

The terrace edge already has a railing, set to the height the code requires above the terrace floor. Build a platform eighteen inches high right beside it, and that railing is now eighteen inches too short for anyone standing on the platform. So we hold the raised level back from the edge, far enough that the railing stays out of reach from on top. If you want the platform at the edge for the view, it gets its own railing at full height.

The platform stands on adjustable pedestals that rest on the terrace surface. Nothing goes through the waterproofing. Every piece is sized to come up in the freight elevator, and we check the weight on each pedestal against what the terrace can carry. Drains in the terrace stay under panels that lift out, so water still reaches them after the raised level goes down. The boards can match the trim or the floors inside, so the terrace reads as part of the home.

What is included in multi-level decks in Downtown

The alternative to stepping a deck is standing it on tall posts, and on a sloping lot that gets expensive quickly. Long posts need lateral bracing. The stair run grows by roughly 14 inches of horizontal travel for every foot of height, so a deck four feet up throws a flight most of five feet into the yard. And every foot above 30 inches means guard all the way around.

Stepping it changes all three. Two platforms at 18 and 36 inches cover the same fall as one at 36, but the lower one needs no guard at all and the steps between levels are a short flight rather than a staircase. Less railing, less bracing, less stair, set against the cost of a second beam line and the connection between the two frames. On a flat lot people build them for a different reason: a level change separates the grill from the table and the table from the seating without any walls.

Levels set from your doors and the fall

Heights come off the door sills and the slope of the yard, so each level lands where it is actually usable.

Every level on its own footings

No level hanging off the one above it. That is what stops one settling and pulling the rest of the structure out of true.

Short flights between levels

Two or three steps, built to the same tolerance as a staircase. Between levels is exactly where people expect the ground and find a step.

Timber decks stepping down the back of a building on a slope

When one level is not enough on a Downtown yard

Four things that say a single-level deck is the wrong shape for your yard.

The yard falls more than about 18 inches across the footprint

At that point a single deck is either high at one end or needs the ground reworked. Stepping it keeps the lower platform near grade, which is where the savings on guard and stair come from.

The stair run would eat the yard

Roughly 14 inches of projection for every foot of height. A deck four feet up puts a flight nearly five feet into the lawn. That is often straight through the spot you wanted the deck for.

You want the grill away from where people sit

A level change does this in a way furniture never does. It is the most common non-terrain reason people build them and it is a legitimate one.

Two doors at two different heights

A slider off the kitchen and a door off a sunken family room are rarely level with each other. Two platforms let both open straight out with no step at either threshold.

Worth knowing

The 30-inch line decides the design

Most jurisdictions here want a guard once the walking surface is more than 30 inches above the ground below. That one number drives a multi-level design more than anything else, because guard is priced by the foot.

It is measured to the ground at the worst point near the deck edge, not at the house. On a falling lot a platform 24 inches up at the back is easily 34 at the front corner, and the guard requirement follows the worst case.

What a second level costs

It adds a beam, its footings, the connection to the level above, and a short flight between them. It takes guard away wherever the lower level sits under 30 inches, and it shortens the main stair.

On a slope those roughly cancel, and the stepped deck ends up close in price and much better to use. On a flat lot nothing is removed, so it is a straight addition, and what it buys is a deck that zones itself: the grill off the traffic route, the table away from the seating, with no walls anywhere.

FAQ

Multi-Level Decks in Downtown questions

Can a terrace deck have a raised second level?

Yes, on pedestals, held back from the edge or given its own railing.

Why keep the raised level back from the edge?

A platform beside the existing railing makes it too short for anyone standing on top.

What if we want the raised level at the edge?

Then it gets its own railing at full height above its own floor.

Does anything go through the waterproofing?

No. Adjustable pedestals rest on the terrace surface.

Can the terrace carry a deck platform?

We check the weight on each pedestal against the terrace rating before the design is settled.

Who has to approve a raised platform on a terrace?

The association first, since it owns the building shell, then Cincinnati for the permit on the same drawings.

We bring your vision to life

Most of our work starts as a sketch on a kitchen table. A door that opens onto a drop, a slope nobody wants to mow, a corner the sun ruins at four in the afternoon. We measure it, draw it, price it line by line, and build the deck you signed off on rather than the one that was easiest to frame.

Bulldog 6 step process

A deck that is still tight in fifteen years is not an accident of good lumber. It is the result of standards you can count on.

  1. Design & Layout

    We measure up, then agree the size, the shape, the materials and where the steps go. You get a drawing and an itemized price before anything is ordered.

  2. Engineering & Permit

    We draw the plans, get them stamped by an engineer where the county asks for it, submit them and pull the permit. Inspections are booked and the boards go on order.

  3. Demolition & Footings

    The old deck leaves in a dumpster the same week. The utility locate goes in two working days before digging, the footings go below the frost line, and the holes are inspected before concrete.

  4. Framing & Flashing

    We bolt the frame to the house and flash where the two meet, so rain runs off instead of into the wall. The county inspects it before any decking covers it.

  5. Decking & Railing

    Boards go down with the right gaps, the railing is built to take a grown adult leaning on it, and every step is the same height. We sweep up daily.

  6. Inspection & Sign-Off

    We walk the finished deck with you and fix your list before the final payment. That last pass is the Bulldog Finish, and the paperwork is yours to keep.

Our work

Decks we have built

A roof over the full width of the deck, with recessed downlights set into the ceiling, a stone fireplace at the far end and a screen mounted above it. Dining table, bench seating and a lounge set all sit under cover, inside a black aluminum guard.

Covered deck with a stone fireplace and a mounted screen

Gray-brown composite decking shot into a low sun, with round black balusters between white posts and a molded cap along the top rail. The boards run parallel to the guard, and the lawn falls away past it.

Composite boards and black aluminum balusters

Who you are hiring

Cincinnati deck builders since 2001

A family-owned crew out of Cincinnati, covering both sides of the river and the communities around it.

What we are good at is structure that has to last. We are not the cheapest quote you will get, and the difference is under the boards rather than on top of them.

  • 1,400+ decks built and rebuilt since 2001
  • Built for freeze-thaw winters and clay that heaves
  • W-2 carpenters on payroll, never subcontracted out
  • Permits pulled in every jurisdiction we work in
  • Written, itemized estimates before you commit
Bulldog Deck medallion: building Cincinnati decks, 25+ years, established 2001

Why homeowners choose us

What makes us different

Six things you can check before you sign anything, and hold us to afterwards.

  • Family-owned and operated since 2001
  • Licensed and fully insured
  • 4.9 stars from 600+ reviews
  • Financing available
  • Decks built to last through Ohio winters
  • Composite, wood, covered decks and pergolas

In their words

What homeowners say

Great experience from the entire team. Very professional contractors, who deliver on their design (which by the way are spot on!). I hope to use them more in the future. My wife and I are excited to use our new deck with the entire family. Shout out
JJosephDeck Build
There is a reason why Bulldog Deck is an award winning company. Each time we step out onto our amazing deck, we are reminded of the all the designing, planning and constructing that puts them at the top. My wife found Bulldog Deck and was impressed
PPeterDeck Build
My family and I couldn't be happier with our new outdoor living space and Bulldog Deck were extremely professional throughout the entire process and the end result was just amazing! As important is the follow up and customer support that we
MMarkOutdoor Living Space
A back yard with a raised deck, stairs down to a patio and a pergola over the seating

Financing available

Spread it across the year, not the month

A new deck is one summer of work, and our financing menu is built so it does not have to be one summer of savings. Spread it across the year on approved credit and the deck goes in this season.

0%Interest for 12 months on approved credit
$40,000Available for larger builds and covered structures
Soft pullApplying will not affect your credit score
84 moLonger terms available on bigger scopes

On approved credit. Terms vary by lender and project size.

Materials

Decking materials we build with in Downtown

Pressure-treated pine

The most affordable and most common choice, and it takes a stain beautifully every time we re-coat it.

Redwood and cedar

Naturally resistant to rot and insects, with a rich warm color and a softer feel underfoot.

Tropical hardwoods

Ipe, tigerwood and cumaru. Dense enough to shrug off dents, insects and rot for decades.

Capped composite

Recycled wood fiber and plastic wrapped in a protective polymer shell. No annual sealing.

Advanced PVC

Fully synthetic with no wood content. Light, highly moisture-resistant and cooler underfoot in sun.

Aluminum

Fireproof, rust-proof and bug-proof, and lasts a lifetime with almost no upkeep.

Where we work

Proudly decking the Tri-State

Cincinnati and Surrounding Areas: southwest Ohio, Northern Kentucky and southeastern Indiana. 170 communities, covered by our own crews.

Map of the Cincinnati region and surrounding areas covering our service area across southwest Ohio, Northern Kentucky and southeastern Indiana
Map data © OpenStreetMap contributors

Counties & cities we serve

Hamilton County, OH

  • Cincinnati
  • Blue Ash, OH
  • Norwood, OH
  • Montgomery, OH

Butler County, OH

  • West Chester, OH
  • Hamilton, OH
  • Fairfield, OH

Warren County, OH

  • Mason, OH
  • South Lebanon, OH
  • Maineville, OH

Clermont County, OH

  • Milford, OH
  • Batavia, OH
  • New Richmond, OH

Kenton County, KY

  • Covington, KY
  • Fort Mitchell, KY
  • Erlanger, KY

Campbell County, KY

  • Newport, KY
  • Fort Thomas, KY
  • Bellevue, KY

Boone County, KY

  • Florence, KY
  • Union, KY
  • Burlington, KY

Dearborn County, IN

  • Lawrenceburg, IN
  • Aurora, IN
  • Greendale, IN

No obligation

Get a written estimate, not a guess

We walk the job, measure it, and leave you with an itemized number. No obligation and no follow-up pressure.

Request your estimate

Most estimates are scheduled within two business days.

No obligation, no high-pressure sales. Or call (513) 657-3750.

Multi-Level Decks in 170 neighborhoods covered by Bulldog Deck

Cincinnati Neighborhoods(52)

Hamilton County, OH(54)