Treated pine · Western red cedar · Ipe & other hardwoods
Wood Decks: Treated Pine, Cedar & Hardwood
Timber is still the cheapest way to get a deck and the only way to get one that can be sanded back and made new again fifteen years later. A clean and a re-coat every two to three years is what keeps it there, and it is a job we come back and do, on lumber fastened with hardware that will not react with the treatment.

What wood decks actually involves
There are three practical timber choices around here and they are not close substitutes. Pressure-treated southern yellow pine is the default: cheapest, strongest for its size, and the material almost every deck frame in the region is built from whatever is on top. Western red cedar is about a third lighter, naturally rot-resistant in the heartwood, and holds a stain beautifully. Tropical hardwoods like ipe and its relatives are dense enough to be genuinely difficult to work and last decades with almost nothing done to them.
Two things decide whether a timber deck stays flat, and both are settled before the lumber is delivered. The first is dry stock. Lumber comes off the treatment cycle saturated, and a board laid soaking shrinks, cups and checks as it dries in place, opening gaps and popping fasteners, so we buy kiln-dried-after-treatment where it is available and let the rest acclimate on site. The second is putting cedar where it performs. Cedar is soft, and boards over joists at 24 inches feel springy where pine does not, so it goes on the surface, the railings and the pergola rafters, over a treated pine frame.
What is included in wood decks
Lumber picked board by board
Kiln-dried where we can get it, crowns sighted, laid bark-side up. It is the difference between a deck that stays flat and one that cups.
Fasteners that will not stain the wood
Hot-dip galvanized or stainless throughout. Cheap screws bleed black streaks down every board within a season and there is no fixing it after.
A finish schedule you actually get told
What goes on it and when, in writing, and we come back and do it. A clean and a re-coat every two to three years keeps a timber deck looking new.

When timber is the right choice
Timber is the right answer more often than the composite industry suggests. These are the four situations where it clearly wins.
You are selling within five years
A new treated pine deck recovers a good share of its cost at resale and costs roughly half what composite does to build. On a house you are selling, it is the version of the job that puts the most back in your pocket.
The deck is large
The price gap between timber and composite scales with square footage. On a 200 square foot deck the difference is real but manageable; on a 700 square foot multi-level it is often the difference between building this year and not.
You want it to look like wood
Composite has got very good and it is still not timber at arm’s length. If the look matters more than the maintenance, on a cabin, a historic house, or a covered deck you will be looking at up close, cedar or hardwood is what you want.
The deck is already timber and structurally sound
Gray is a surface condition, not a structural one. A sound timber deck strips, sands and seals back to new, and that is a fraction of the cost of a rebuild, which is the whole argument for having built it in timber.
Worth knowing
When a new treated deck is ready to seal
Treated lumber arrives wet with treatment solution, and stain works by soaking in. Put stain on a wet board and it sits on top, never cures, and peels within a season. Sprinkle a few drops of water on it: if they bead up rather than soaking in, it is not ready.
Around here that is four weeks to several months, depending on when the deck went down and how much sun it gets. Anyone offering to seal a treated deck the week it is built is selling you a coat that will fail.
What hardwood is like to live with
Ipe and the other dense tropical hardwoods last longer than anything else we lay. Left alone they silver to an even gray and need nothing at all. Kept brown, a UV oil once a year holds the color, and that is on the list when we come back.
They are also heavy. A hardwood surface adds real dead load over pine, which on a marginal existing frame can push it past its span, so we size the frame for it from the start rather than meeting it as a late swap.
FAQ
Wood Decks questions
How long does a pressure-treated deck last?
The frame commonly gives 15 to 25 years around here, and the walking surface 10 to 15, because it takes the sun and the water directly. Both figures assume a clean and a re-coat every two to three years, which is a job we come back and do. The treatment itself keeps resisting rot either way; the finish is what keeps the boards smooth and the color even.
Cedar or pressure-treated pine?
Pine for the frame in nearly every case: it is stronger, cheaper and rated for ground contact. Cedar for the surface and the railings, where the warm color, the lighter weight and the softer feel underfoot are what you are paying for. A cedar surface over a pine frame is the most common combination we build and it is a sound one.
When can I stain a new wood deck?
When it will take the stain, which is not the same as when it looks dry. Sprinkle water on a board: if it beads, the wood is still too wet and the stain will sit on top and peel. If it soaks in within a minute or two, you are ready. For new treated lumber that is usually somewhere between a month and a season depending on weather and exposure.
Do wood decks splinter?
Treated pine weathers to a rougher surface over time, and it is one of the few deck problems that reverses completely. An orbital sander over the traffic areas takes a gray, splintery board back to new timber, which is something no synthetic surface can do at any price. We do that as its own job, and on a deck that gets it every few years the question never really arises.
What fasteners do you use on treated lumber?
Hot-dip galvanized or stainless, never electroplated. Modern copper-azole and ACQ treatments are corrosive to plain and electroplated steel, and a deck built with the wrong screws will have rust bleeding out of every hole within a couple of years and hangers losing capacity where nobody can see them.
Can you build a wood deck and add composite later?
Yes, and it is a reasonable way to stage the work. It only holds if the frame is built for composite from the start. The joist spacing has to suit the board you will eventually lay, which usually means 16 inches on center rather than the 24 a timber surface tolerates. Say so at design stage and the extra framing costs little, and the deck is ready for the swap whenever you want it.
Is ipe worth it?
If you want a timber deck that will outlast you, yes. Ipe is dense enough to shrug off dents, insects and rot with almost nothing done to it, and left alone it silvers to an even gray that needs no upkeep at all. It costs more to install because every fastener needs a pilot hole, so it makes the most sense where the look of real dense hardwood is the point, or on a smaller high-visibility deck where that cost is contained.
We bring your vision to life
Most of our work starts as a sketch on a kitchen table. A door that opens onto a drop, a slope nobody wants to mow, a corner the sun ruins at four in the afternoon. We measure it, draw it, price it line by line, and build the deck you signed off on rather than the one that was easiest to frame.
Bulldog 6 step process
A deck that is still tight in fifteen years is not an accident of good lumber. It is the result of standards you can count on.
Design & Layout
We measure up, then agree the size, the shape, the materials and where the steps go. You get a drawing and an itemized price before anything is ordered.
Engineering & Permit
We draw the plans, get them stamped by an engineer where the county asks for it, submit them and pull the permit. Inspections are booked and the boards go on order.
Demolition & Footings
The old deck leaves in a dumpster the same week. The utility locate goes in two working days before digging, the footings go below the frost line, and the holes are inspected before concrete.
Framing & Flashing
We bolt the frame to the house and flash where the two meet, so rain runs off instead of into the wall. The county inspects it before any decking covers it.
Decking & Railing
Boards go down with the right gaps, the railing is built to take a grown adult leaning on it, and every step is the same height. We sweep up daily.
Inspection & Sign-Off
We walk the finished deck with you and fix your list before the final payment. That last pass is the Bulldog Finish, and the paperwork is yours to keep.
Who you are hiring
Cincinnati deck builders since 2001
A family-owned crew out of Cincinnati, covering both sides of the river and the communities around it.
What we are good at is structure that has to last. We are not the cheapest quote you will get, and the difference is under the boards rather than on top of them.
- 1,400+ decks built and rebuilt since 2001
- Built for freeze-thaw winters and clay that heaves
- W-2 carpenters on payroll, never subcontracted out
- Permits pulled in every jurisdiction we work in
- Written, itemized estimates before you commit

Why homeowners choose us
What makes us different
Six things you can check before you sign anything, and hold us to afterwards.
- Family-owned and operated since 2001
- Licensed and fully insured
- 4.9 stars from 600+ reviews
- Financing available
- Decks built to last through Ohio winters
- Composite, wood, covered decks and pergolas
In their words
What homeowners say
Great experience from the entire team. Very professional contractors, who deliver on their design (which by the way are spot on!). I hope to use them more in the future. My wife and I are excited to use our new deck with the entire family. Shout out
There is a reason why Bulldog Deck is an award winning company. Each time we step out onto our amazing deck, we are reminded of the all the designing, planning and constructing that puts them at the top. My wife found Bulldog Deck and was impressed
My family and I couldn't be happier with our new outdoor living space and Bulldog Deck were extremely professional throughout the entire process and the end result was just amazing! As important is the follow up and customer support that we
Related services

Financing available
Spread it across the year, not the month
A new deck is one summer of work, and our financing menu is built so it does not have to be one summer of savings. Spread it across the year on approved credit and the deck goes in this season.
On approved credit. Terms vary by lender and project size.
Materials
Decking materials we build with

Pressure-treated pine
The most affordable and most common choice, and it takes a stain beautifully every time we re-coat it.

Redwood and cedar
Naturally resistant to rot and insects, with a rich warm color and a softer feel underfoot.

Tropical hardwoods
Ipe, tigerwood and cumaru. Dense enough to shrug off dents, insects and rot for decades.

Capped composite
Recycled wood fiber and plastic wrapped in a protective polymer shell. No annual sealing.

Advanced PVC
Fully synthetic with no wood content. Light, highly moisture-resistant and cooler underfoot in sun.

Aluminum
Fireproof, rust-proof and bug-proof, and lasts a lifetime with almost no upkeep.
Where we work
Proudly decking the Tri-State
Cincinnati and Surrounding Areas: southwest Ohio, Northern Kentucky and southeastern Indiana. 170 communities, covered by our own crews.

Counties & cities we serve
Hamilton County, OH
- Cincinnati
- Blue Ash, OH
- Norwood, OH
- Montgomery, OH
Butler County, OH
- West Chester, OH
- Hamilton, OH
- Fairfield, OH
Warren County, OH
- Mason, OH
- South Lebanon, OH
- Maineville, OH
Clermont County, OH
- Milford, OH
- Batavia, OH
- New Richmond, OH
Kenton County, KY
- Covington, KY
- Fort Mitchell, KY
- Erlanger, KY
Campbell County, KY
- Newport, KY
- Fort Thomas, KY
- Bellevue, KY
Boone County, KY
- Florence, KY
- Union, KY
- Burlington, KY
Dearborn County, IN
- Lawrenceburg, IN
- Aurora, IN
- Greendale, IN
No obligation
Get a written estimate, not a guess
We walk the job, measure it, and leave you with an itemized number. No obligation and no follow-up pressure.
Request your estimate
Most estimates are scheduled within two business days.
Wood Decks in 170 neighborhoods covered by Bulldog Deck
Cincinnati Neighborhoods(52)
- Sedamsville
- Sayler Park
- Riverside
- East Price Hill
- West Price Hill
- Lower Price Hill
- Over-the-Rhine
- Downtown
- West End
- Mount Adams
- Mount Auburn
- Clifton
- Corryville
- Northside
- College Hill
- Walnut Hills
- East Walnut Hills
- Avondale
- Hyde Park
- Oakley
- Mount Lookout
- Columbia-Tusculum
- Mount Washington
- Madisonville
- Pleasant Ridge
- Westwood
- Pendleton
- Queensgate
- CUF
- Camp Washington
- South Fairmount
- East End
- North Fairmount
- Evanston
- South Cumminsville
- English Woods
- North Avondale
- Millvale
- Paddock Hills
- Spring Grove Village
- Linwood
- Bond Hill
- Villages of Roll Hill
- East Westwood
- Western Hills
- California
- Carthage
- Winton Hills
- Roselawn
- Mount Airy
- Hartwell
- Kennedy Heights
Hamilton County, OH(54)
- Norwood
- Blue Ash
- Montgomery
- Madeira
- Wyoming
- Mariemont
- Cheviot
- Covedale
- St. Bernard
- Elmwood Place
- Delhi Hills
- Golf Manor
- Fairfax
- Mack
- Monfort Heights
- Bridgetown
- Finneytown
- Amberley
- Arlington Heights
- North College Hill
- Newtown
- Turpin Hills
- Silverton
- Lockland
- Groesbeck
- Mount Healthy
- Reading
- Dent
- Deer Park
- Terrace Park
- Dry Run
- White Oak
- Forestville
- Cherry Grove
- Kenwood
- Lincoln Heights
- Dillonvale
- Woodlawn
- Addyston
- Greenhills
- Northbrook
- Indian Hill
- Evendale
- Glendale
- Sharonville
- Northgate
- Springdale
- Miamitown
- Forest Park
- Pleasant Run
- Cleves
- North Bend
- Loveland
- Harrison
Clermont County, OH(16)
- Mount Carmel
- Summerside
- Withamsville
- Milford
- Mulberry
- Mount Repose
- Day Heights
- New Richmond
- Amelia
- Batavia
- Owensville
- Goshen
- Moscow
- Newtonsville
- Williamsburg
- Bethel
Butler County, OH(9)
- West Chester
- Ross
- Fairfield
- Beckett Ridge
- Wetherington
- Hamilton
- Millville
- New Miami
- Monroe
Warren County, OH(6)
- Mason
- Landen
- Loveland Park
- Maineville
- Pleasant Plain
- South Lebanon
Kenton County, KY(15)
- Covington
- Erlanger
- Ludlow
- Park Hills
- Bromley
- Fort Wright
- Fort Mitchell
- Villa Hills
- Lakeside Park
- Crescent Springs
- Crestview Hills
- Edgewood
- Taylor Mill
- Elsmere
- Independence
Campbell County, KY(10)
- Newport
- Bellevue
- Fort Thomas
- Dayton
- Southgate
- Wilder
- Highland Heights
- Cold Spring
- Alexandria
- Melbourne
Boone County, KY(5)
- Florence
- Hebron
- Burlington
- Union
- Walton
Dearborn County, IN(3)
- Lawrenceburg
- Greendale
- Aurora



