Tiered · Stepped · Built into the slope · Park Hills, KY · 41011
Multi-Level Decks in Park Hills, KY
Multi-level decks in Park Hills, where the stair landing is built wide enough to be a room. A multi-level deck is what you build when the ground will not cooperate. Stepping it down a slope in two or three platforms keeps each level closer to grade and shortens the stair run dramatically. It can take an entire guard out of the job, because a deck under 30 inches to the ground does not need one. You also get separate zones instead of one large floor with everything on it.

Multi-level decks in Park Hills
Park Hills (ZIP 41011) has a lot of houses sitting well up off their own ground, and a deck at the back door on one of those is a long way from the grass. That distance is usually treated as a stair problem. It is more useful as a design one.
A flight cannot run indefinitely without a break in it. Past a certain rise the stair needs an intermediate landing, and that landing is already a platform: its own posts, its own footings, its own frame, sitting halfway between the deck and the yard. Built to the minimum it is a place to turn around on. Built four or five feet deeper it is a second level, and the extra cost is decking, a few more feet of beam and a slightly bigger hole in two places, because the structure was going in either way.
What that gets you is the part people like most about a tall deck. The upper platform is level with the kitchen and it is where the table goes. The middle one is close enough to the yard to hear somebody in it, low enough that the guard stops blocking the view out, and it is the shaded half on an afternoon when the top is not. It also breaks the descent into two short flights instead of one long one, which is what keeps the climb back up from being the reason nobody goes down.
So the flight gets designed before it gets drawn. We work out where the break has to fall on your rise, then ask how much wider that platform wants to be, and price the two versions next to each other so the choice is a real one.
What is included in multi-level decks in Park Hills
The alternative to stepping a deck is standing it on tall posts, and on a sloping lot that gets expensive quickly. Long posts need lateral bracing. The stair run grows by roughly 14 inches of horizontal travel for every foot of height, so a deck four feet up throws a flight most of five feet into the yard. And every foot above 30 inches means guard all the way around.
Stepping it changes all three. Two platforms at 18 and 36 inches cover the same fall as one at 36, but the lower one needs no guard at all and the steps between levels are a short flight rather than a staircase. Less railing, less bracing, less stair, set against the cost of a second beam line and the connection between the two frames. On a flat lot people build them for a different reason: a level change separates the grill from the table and the table from the seating without any walls.
Levels set from your doors and the fall
Heights come off the door sills and the slope of the yard, so each level lands where it is actually usable.
Every level on its own footings
No level hanging off the one above it. That is what stops one settling and pulling the rest of the structure out of true.
Short flights between levels
Two or three steps, built to the same tolerance as a staircase. Between levels is exactly where people expect the ground and find a step.

When one level is not enough on a Park Hills yard
Four things that say a single-level deck is the wrong shape for your yard.
The yard falls more than about 18 inches across the footprint
At that point a single deck is either high at one end or needs the ground reworked. Stepping it keeps the lower platform near grade, which is where the savings on guard and stair come from.
The stair run would eat the yard
Roughly 14 inches of projection for every foot of height. A deck four feet up puts a flight nearly five feet into the lawn. That is often straight through the spot you wanted the deck for.
You want the grill away from where people sit
A level change does this in a way furniture never does. It is the most common non-terrain reason people build them and it is a legitimate one.
Two doors at two different heights
A slider off the kitchen and a door off a sunken family room are rarely level with each other. Two platforms let both open straight out with no step at either threshold.
Worth knowing
The 30-inch line decides the design
Most jurisdictions here want a guard once the walking surface is more than 30 inches above the ground below. That one number drives a multi-level design more than anything else, because guard is priced by the foot.
It is measured to the ground at the worst point near the deck edge, not at the house. On a falling lot a platform 24 inches up at the back is easily 34 at the front corner, and the guard requirement follows the worst case.
What a second level costs
It adds a beam, its footings, the connection to the level above, and a short flight between them. It takes guard away wherever the lower level sits under 30 inches, and it shortens the main stair.
On a slope those roughly cancel, and the stepped deck ends up close in price and much better to use. On a flat lot nothing is removed, so it is a straight addition, and what it buys is a deck that zones itself: the grill off the traffic route, the table away from the seating, with no walls anywhere.
FAQ
Multi-Level Decks in Park Hills questions
Who reviews this in Park Hills?
The City of Park Hills, with Kenton County involved on the building side. The submission shows the rise broken into two flights with the landing dimensioned, because a landing carrying furniture is assessed as a deck level and not as part of the stair.
When is a landing required?
It comes off the total rise of the flight, so it depends on how far your deck sits above the ground. We measure that at the estimate and it decides whether this is a choice you have or one the code has already made for you.
How much wider does it need to be?
About five feet deep is where a landing stops being a pause and starts holding two chairs and a small table. Eight gets a full setting on it.
Does the middle level need its own guard?
It does where it sits above the height the code sets, and on these houses it usually does. It is a shorter guard than the top one, so the view from the upper level carries over it.
Can the landing be added later?
It is much better set out now. The footings and the beam under a wide landing are different from the ones under a minimum one, so deciding at the drawing stage is what makes it a small extra rather than a second job.
What does the ground here allow?
Hillside footings go deeper and get set back from the face of the slope, which we establish per lot rather than assuming. The landing posts are the ones furthest down the hill, so they are the ones worth getting right.
We bring your vision to life
Most of our work starts as a sketch on a kitchen table. A door that opens onto a drop, a slope nobody wants to mow, a corner the sun ruins at four in the afternoon. We measure it, draw it, price it line by line, and build the deck you signed off on rather than the one that was easiest to frame.
Bulldog 6 step process
A deck that is still tight in fifteen years is not an accident of good lumber. It is the result of standards you can count on.
Design & Layout
We measure up, then agree the size, the shape, the materials and where the steps go. You get a drawing and an itemized price before anything is ordered.
Engineering & Permit
We draw the plans, get them stamped by an engineer where the county asks for it, submit them and pull the permit. Inspections are booked and the boards go on order.
Demolition & Footings
The old deck leaves in a dumpster the same week. The utility locate goes in two working days before digging, the footings go below the frost line, and the holes are inspected before concrete.
Framing & Flashing
We bolt the frame to the house and flash where the two meet, so rain runs off instead of into the wall. The county inspects it before any decking covers it.
Decking & Railing
Boards go down with the right gaps, the railing is built to take a grown adult leaning on it, and every step is the same height. We sweep up daily.
Inspection & Sign-Off
We walk the finished deck with you and fix your list before the final payment. That last pass is the Bulldog Finish, and the paperwork is yours to keep.
Our work
Decks we have built

Covered deck with a stone fireplace and a mounted screen

Composite boards and black aluminum balusters
Who you are hiring
Cincinnati deck builders since 2001
A family-owned crew out of Cincinnati, covering both sides of the river and the communities around it.
What we are good at is structure that has to last. We are not the cheapest quote you will get, and the difference is under the boards rather than on top of them.
- 1,400+ decks built and rebuilt since 2001
- Built for freeze-thaw winters and clay that heaves
- W-2 carpenters on payroll, never subcontracted out
- Permits pulled in every jurisdiction we work in
- Written, itemized estimates before you commit

Why homeowners choose us
What makes us different
Six things you can check before you sign anything, and hold us to afterwards.
- Family-owned and operated since 2001
- Licensed and fully insured
- 4.9 stars from 600+ reviews
- Financing available
- Decks built to last through Ohio winters
- Composite, wood, covered decks and pergolas
In their words
What homeowners say
Great experience from the entire team. Very professional contractors, who deliver on their design (which by the way are spot on!). I hope to use them more in the future. My wife and I are excited to use our new deck with the entire family. Shout out
There is a reason why Bulldog Deck is an award winning company. Each time we step out onto our amazing deck, we are reminded of the all the designing, planning and constructing that puts them at the top. My wife found Bulldog Deck and was impressed
My family and I couldn't be happier with our new outdoor living space and Bulldog Deck were extremely professional throughout the entire process and the end result was just amazing! As important is the follow up and customer support that we
Related services

Financing available
Spread it across the year, not the month
A new deck is one summer of work, and our financing menu is built so it does not have to be one summer of savings. Spread it across the year on approved credit and the deck goes in this season.
On approved credit. Terms vary by lender and project size.
Materials
Decking materials we build with in Park Hills

Pressure-treated pine
The most affordable and most common choice, and it takes a stain beautifully every time we re-coat it.

Redwood and cedar
Naturally resistant to rot and insects, with a rich warm color and a softer feel underfoot.

Tropical hardwoods
Ipe, tigerwood and cumaru. Dense enough to shrug off dents, insects and rot for decades.

Capped composite
Recycled wood fiber and plastic wrapped in a protective polymer shell. No annual sealing.

Advanced PVC
Fully synthetic with no wood content. Light, highly moisture-resistant and cooler underfoot in sun.

Aluminum
Fireproof, rust-proof and bug-proof, and lasts a lifetime with almost no upkeep.
Where we work
Proudly decking the Tri-State
Cincinnati and Surrounding Areas: southwest Ohio, Northern Kentucky and southeastern Indiana. 170 communities, covered by our own crews.

Counties & cities we serve
Hamilton County, OH
- Cincinnati
- Blue Ash, OH
- Norwood, OH
- Montgomery, OH
Butler County, OH
- West Chester, OH
- Hamilton, OH
- Fairfield, OH
Warren County, OH
- Mason, OH
- South Lebanon, OH
- Maineville, OH
Clermont County, OH
- Milford, OH
- Batavia, OH
- New Richmond, OH
Kenton County, KY
- Covington, KY
- Fort Mitchell, KY
- Erlanger, KY
Campbell County, KY
- Newport, KY
- Fort Thomas, KY
- Bellevue, KY
Boone County, KY
- Florence, KY
- Union, KY
- Burlington, KY
Dearborn County, IN
- Lawrenceburg, IN
- Aurora, IN
- Greendale, IN
No obligation
Get a written estimate, not a guess
We walk the job, measure it, and leave you with an itemized number. No obligation and no follow-up pressure.
Request your estimate
Most estimates are scheduled within two business days.
Multi-Level Decks in 170 neighborhoods covered by Bulldog Deck
Cincinnati Neighborhoods(52)
- Sedamsville
- Sayler Park
- Riverside
- Multi-Level Decks in East Price Hill
- West Price Hill
- Lower Price Hill
- Over-the-Rhine
- Downtown
- Multi-Level Decks in West End
- Mount Adams
- Mount Auburn
- Clifton
- Corryville
- Northside
- Multi-Level Decks in College Hill
- Walnut Hills
- East Walnut Hills
- Avondale
- Hyde Park
- Oakley
- Mount Lookout
- Columbia-Tusculum
- Mount Washington
- Multi-Level Decks in Madisonville
- Pleasant Ridge
- Westwood
- Pendleton
- Queensgate
- Multi-Level Decks in CUF
- Camp Washington
- South Fairmount
- Multi-Level Decks in East End
- North Fairmount
- Evanston
- South Cumminsville
- English Woods
- North Avondale
- Millvale
- Multi-Level Decks in Paddock Hills
- Spring Grove Village
- Linwood
- Bond Hill
- Villages of Roll Hill
- East Westwood
- Multi-Level Decks in Western Hills
- California
- Carthage
- Winton Hills
- Roselawn
- Mount Airy
- Hartwell
- Kennedy Heights
Hamilton County, OH(54)
- Norwood
- Blue Ash
- Montgomery
- Multi-Level Decks in Madeira
- Multi-Level Decks in Wyoming
- Multi-Level Decks in Mariemont
- Multi-Level Decks in Cheviot
- Covedale
- St. Bernard
- Elmwood Place
- Delhi Hills
- Golf Manor
- Fairfax
- Mack
- Monfort Heights
- Multi-Level Decks in Bridgetown
- Finneytown
- Amberley
- Arlington Heights
- North College Hill
- Newtown
- Multi-Level Decks in Turpin Hills
- Silverton
- Lockland
- Groesbeck
- Mount Healthy
- Reading
- Multi-Level Decks in Dent
- Deer Park
- Terrace Park
- Dry Run
- White Oak
- Forestville
- Cherry Grove
- Kenwood
- Lincoln Heights
- Dillonvale
- Woodlawn
- Addyston
- Greenhills
- Northbrook
- Multi-Level Decks in Indian Hill
- Evendale
- Multi-Level Decks in Glendale
- Sharonville
- Northgate
- Springdale
- Miamitown
- Forest Park
- Multi-Level Decks in Pleasant Run
- Multi-Level Decks in Cleves
- Multi-Level Decks in North Bend
- Loveland
- Harrison
Clermont County, OH(16)
- Mount Carmel
- Summerside
- Withamsville
- Milford
- Mulberry
- Mount Repose
- Day Heights
- New Richmond
- Amelia
- Batavia
- Owensville
- Goshen
- Moscow
- Newtonsville
- Multi-Level Decks in Williamsburg
- Bethel
Butler County, OH(9)
- West Chester
- Ross
- Fairfield
- Beckett Ridge
- Wetherington
- Hamilton
- Millville
- New Miami
- Monroe
Warren County, OH(6)
- Multi-Level Decks in Mason
- Landen
- Loveland Park
- Maineville
- Pleasant Plain
- Multi-Level Decks in South Lebanon
Kenton County, KY(15)
- Covington
- Erlanger
- Ludlow
- Multi-Level Decks in Park HillsCurrent page
- Bromley
- Fort Wright
- Fort Mitchell
- Villa Hills
- Lakeside Park
- Crescent Springs
- Crestview Hills
- Edgewood
- Taylor Mill
- Elsmere
- Independence
Campbell County, KY(10)
- Newport
- Bellevue
- Multi-Level Decks in Fort Thomas
- Dayton
- Southgate
- Wilder
- Highland Heights
- Cold Spring
- Alexandria
- Melbourne
Boone County, KY(5)
- Florence
- Hebron
- Burlington
- Union
- Walton
Dearborn County, IN(3)
- Lawrenceburg
- Multi-Level Decks in Greendale
- Aurora